Main Avenue, West Fargo
STATUS
Work has been completed.
SCOPE
Complete reconstruction of Main Avenue between 6th St E and 45th St. The project included the removal of most of the frontage road.
PURPOSE
The need for the proposed reconstruction of Main Avenue was driven by a number of deficiencies along the project corridor. These included deteriorated pavement, poor intersection geometrics, uncontrolled access, inadequate drainage and a lack of pedestrian/bicycle facilities.
FUNDING
80% Federal, 10% State and 10% City for participating items. Items such as sanitary sewer and water main work along with other miscellaneous items were 100% City.
TRAFFIC COUNTS
| Location | Existing 2005 | Projected 2025 | Increase |
|---|---|---|---|
| 17th Street E to 45th Street | 16,000 adt | 23,510 adt | 47% |
| Near 9th Street E | 13,500 adt | 21,600 adt | 60% |


Enlarge Map »