7th Ave N Bridge Over I-29

STATUS

The project has been completed.

SCOPE

Remove and replace driving surface on bridge, widen bridge to add a pedestrian crossing, and reconstruct roadway on both sides of the bridge including intersections.

PURPOSE

The project improved the condition of the driving surface on the bridge. It also widened the bridge to allow the construction of a multi-use path across the interstate. In addition, erosion was exposing bridge piling and this project fixed this erosion. Additional lighting was also added.

FUNDING

43% Federal, 5% State and 52% City

TRAFFIC COUNTS

Location Existing 2010 Projected 2030 Increase
7th Ave N Overpass Bridge 9,375 adt 18,090 adt 93%

PROJECT IMAGES